• About
    • Profile
    • People
    • Careers
    • Contact
  • Commercial
    • Project List
    • Gateway Banking Centre
    • Jasper Avenue Banking Centre
    • Kelowna Banking Centre
    • Lethbridge Banking Centre
    • West Georgia Tower
  • Educational
    • Project List
    • Harry Ainlay High School Renovation
    • Harry Ainlay High School Restoration
    • Holy Trinity Academy
    • Jasper Place High School Cafeteria
    • W.P. Wagner School Learning Commons
  • Industrial
    • Project List
    • Grassland Vehicle Inspection Station
    • Industrial Roof Structure Restoration
  • Residential
    • Project List
    • Arzt House
    • Bow Haus
  • Churches
    • Project List
    • Beulah Alliance Church
    • Eaglemont Christian Church
    • North Life Baptist Church Restoration
  • Restoration
    • Project List
    • Harry Ainlay High School Restoration
    • Industrial Roof Structure Restoration
    • North Life Baptist Church Restoration
  • About
    • Profile
    • People
    • Careers
    • Contact
  • Commercial
    • Project List
    • Gateway Banking Centre
    • Jasper Avenue Banking Centre
    • Kelowna Banking Centre
    • Lethbridge Banking Centre
    • West Georgia Tower
  • Educational
    • Project List
    • Harry Ainlay High School Renovation
    • Harry Ainlay High School Restoration
    • Holy Trinity Academy
    • Jasper Place High School Cafeteria
    • W.P. Wagner School Learning Commons
  • Industrial
    • Project List
    • Grassland Vehicle Inspection Station
    • Industrial Roof Structure Restoration
  • Residential
    • Project List
    • Arzt House
    • Bow Haus
  • Churches
    • Project List
    • Beulah Alliance Church
    • Eaglemont Christian Church
    • North Life Baptist Church Restoration
  • Restoration
    • Project List
    • Harry Ainlay High School Restoration
    • Industrial Roof Structure Restoration
    • North Life Baptist Church Restoration

Let’s work together

Like our work? Arrange a meeting with us at our office, We'll be happy to work with you!

Wanna join our crazy team?

We are always looking for new talents and we were expecting you. Time to apply, buddy!

  • ABOUT
  • CONTACT
N53 ARCHITECTURE INC
  • About
    • Profile
    • People
    • Careers
    • Contact
  • Commercial
    • Project List
    • Gateway Banking Centre
    • Jasper Avenue Banking Centre
    • Kelowna Banking Centre
    • Lethbridge Banking Centre
    • West Georgia Tower
  • Educational
    • Project List
    • Harry Ainlay High School Renovation
    • Harry Ainlay High School Restoration
    • Holy Trinity Academy
    • Jasper Place High School Cafeteria
    • W.P. Wagner School Learning Commons
  • Industrial
    • Project List
    • Grassland Vehicle Inspection Station
    • Industrial Roof Structure Restoration
  • Residential
    • Project List
    • Arzt House
    • Bow Haus
  • Churches
    • Project List
    • Beulah Alliance Church
    • Eaglemont Christian Church
    • North Life Baptist Church Restoration
  • Restoration
    • Project List
    • Harry Ainlay High School Restoration
    • Industrial Roof Structure Restoration
    • North Life Baptist Church Restoration
W.P. Wagner School Learning Commons
W.P. Wagner School Learning Commons
Client
Edmonton Public Schools
Location
Edmonton, AB
Scope
Renovation
Size
860 m² (9,250 sf)
Typology
Institutional

Working with Edmonton Public Schools, N53 Architecture led the design and construction of renovations to the Learning Commons and Resource Centre at W.P. Wagner High School between 2018 and 2020. Due to the extensive project scope, changing market conditions, and scheduling considerations at the school, the project was completed in three phases, with three separate contractors.

The driving factor for the renovation was providing flexible and modernized spaces that could support student learning through print and digital media, as well as host staff and student meetings of varying sizes, showcase student projects, and function effectively as a social hub within the school. Throughout the design process, N53 collaborated closely with numerous project stakeholders to ensure that the various programmatic goals for the space were achieved in the renovation.

To effectively manage communication with the stakeholders and convey the proposed plans for the renovation in an intuitive and approachable way, N53 created and maintained a comprehensive digital model of the renovation area. Ultimately, using this tool led to productive conversations about how the Learning Commons and Resource Centre could function together and be united with a cohesive interior finishing regime, enriching the design substantially in the process.

The project highlights N53’s strength as a design firm and ability to synthesize client and stakeholder wishes in an imaginative and cost-effective design. The successes of the renovations at W.P. Wagner lie in the input that was gained through meaningful collaboration during the design phase. It also demonstrates the ability to maintain the integrity and consistency of a design through successive cost management exercises, phasing, and different construction teams. N53 effectively responded to these project considerations and recommended adapting the execution of the work to suit the project’s changing circumstances.

© Copyright N53 Architecture Inc. 2025